PDF Bachelor of Science in Biomedical Engineering

EBM 404: Design of an Auscultatory Monitoring System, Project Proposal

Project proposal for an auscultatory monitoring system: the clinical problem of continuous heart and lung sound monitoring, the objectives, the microphone and signal conditioning approach proposed, the literature on electronic auscultation, and the work plan and budget.

Document preview

Page 1 of 17 · first page only

PDF

More materials from the same course.

EBM 404: Remote Patient Monitoring System, Project Presentation Slides presenting the remote patient monitoring project: the problem addressed, the objectives, the system architecture from the sensors through to the remote display, and the progress made on the build. PDF KES 40.00 Maintenance Management of Medical Equipment in Hospitals Open-access article in Industrial Engineering Letters, volume 2 issue 3, by David Mutia and colleagues on maintenance management of medical equipment in Kenyan hospitals: the practices in use, the effect of corrective against preventive maintenance, spare part and record problems, and the factors that determine equipment availability. PDF KES 40.00 Business Plan for a Recreational Centre A completed business plan written for the coursework cover used in the department: the cover template with course, department and school, the choice of location and why, market segments and projected gross sales over four years with percentage growth, the facilities and space required, staffing with the background and responsibilities of each post, the services offered including conference hire and Wi-Fi, liabilities and capital, and the executive support agencies and individuals engaged. PDF KES 40.00 EBM 508: Industrial and Hospital Management Unit Outline Unit outline for industrial and hospital management: the prerequisite, the expected outcomes of evaluating the financial impact of healthcare technologies, selecting them under policy frameworks, using them correctly and efficiently, decommissioning and replacing unsafe and obsolete items, and following modern practice in healthcare technology management, procurement and installation. Sets out contact hours and the continuous assessment weighting, the week-by-week schedule from demand and supply theory through industrial location, planning and risk analysis, the prescribed texts from tissue engineering to hospital management, and the laboratory equipment register that lists spirometer and pneumotach transducers, calibration syringes, disposable bacterial filters, mouthpieces and noseclips, hand switches, breadboard sensors, light stimulators, data acquisition modules and pulse signal kits with their specifications and availability. PDF KES 40.00 Machine Design Project Template, Cover Page Rules and Schedule How the machine design project is presented: the components that must appear centred on the cover page, the rule that a title does not exceed twenty words, the abstract, table of contents and chapter formatting, together with the submission schedule and the weight of each deliverable. PDF KES 40.00