PDF Bachelor of Science in Biomedical Engineering

Risk and Uncertainty in Cost-Benefit Analysis

Toolbox paper written by Karsten Stæhr and published by the Environmental Assessment Institute in April 2006 on how to handle risk and uncertainty inside cost-benefit analysis. Reviews the standard textbook treatments, sets out why many analyses of environmental projects and policies must build on scientific results that carry little explicit uncertainty information, and explains the two errors a decision maker can make: rejecting a project that would have benefited society, and undertaking one that is not socially favourable, with the trade-off that measures which reduce the first error usually increase the second. Covers the estimation of probability distributions, the difference between independent variation across variables and serial correlation across periods for a single variable, illustrated by the persistence of consumption patterns, the assumption of an exponential utility function implying constant risk aversion, and the balancing act of quantifying risk without giving weight to events that are highly unlikely.

Document preview

Page 1 of 46 · first page only

PDF

More materials from the same course.

Project Planning, Scheduling and Resource Allocation A project presentation on planning and scheduling that first summarises the project management process from defining the project and stating the need, problem or opportunity and its objectives, then compares the scheduling techniques: milestone charts, Gantt or simple bar charts with horizontal bars against a time scale, the critical path method, graphical evaluation and review technique, and the precedence diagram method. The second half is a full case study of a bridge project over the Yamuna linking the Allahabad districts of Naini, Jhusi and Phaphamau across an industrial centre of automobile, fertiliser and textile firms, where a narrow two-lane combined highway and railway bridge of the late nineteenth century could no longer carry increasing vehicle weights and sizes. Documents the schedule overrun, a period scheduled from January 1994 to July 2004 against a planned January 1994 to March 2000, or 169 per cent of the plan, and the monitoring regime of seven instrumented positions checking alignment, weight and gradient of the pylons twenty-four hours a day from the toll booth control room, with joint fabrication and the resource and cost schedules that followed. PDF KES 40.00 EBM 505: Medical Physiology Laboratory Report Laboratory report written for the assignment set in the unit: the purpose of the experiment, the apparatus used, the procedure followed, the readings and results obtained, and the discussion that interprets them against the physiology taught in the lectures. PDF KES 40.00 Primary Total Knee Arthroplasty: Indications, Alignment and Complications Clinical lecture slides on primary total knee arthroplasty by Jatinder S. Luthra: prosthetic design from constrained hinged to cruciate-retaining and posterior-stabilised implants, patient selection and indications, ligamentous deficiency and release grading, component rotation and the Q angle, patellofemoral alignment, aseptic loosening as the most common complication, and surgical exposure, balancing and closure principles. PDF KES 40.00 ECU 402: Engineering Economics Discussion Task on Inflation Discussion task setting three questions: defining inflation, explaining how inflation is measured, and tracing the monthly inflation rate in Kenya with labelled diagrams and graphs, including the months of highest and lowest readings and what caused them. PDF KES 40.00 EBM 406: Functions of Engineering Services in a Hospital Lecture on the engineering services department: providing a safe and hazard-free environment, keeping facilities and services under scope in working order, planned preventive maintenance, utilities and medical gas plants, and the interface with biomedical equipment. PDF KES 40.00